Federal Ministry for Transport · 2026 calls closed

€1 Billion for Electric Truck Charging Infrastructure – First Round Closed, More Calls Announced

All three 2026 incentive calls have closed, and all of them were heavily oversubscribed. According to Project Management Jülich (PtJ), further calls are to follow shortly. M3E gets your project ready now, so you can apply from day one of the next call.

€1bn
Programme budget (4 years)
≈ 1,860
Applications in round 1
3.5×
Oversubscribed
≈ €230/kW
Threshold in Call B
⛔ Applications closed: All three 2026 calls have closed – Call A on 5 June after just a few hours, Calls B & C on 7 July 2026. Further calls have been announced. 🔔 Incentive Alert

Three Calls, Clearly Segmented by Target Group and Use Case

The Federal Ministry for Transport (BMV) is providing €1 billion over four years to remove economic barriers to building charging infrastructure for electric trucks and to accelerate market ramp-up. The first three incentive calls differed clearly in target group, use case and selection method. All three have now closed and were heavily oversubscribed. According to Project Management Jülich, further calls are to follow shortly.

Call A · closed
SMEs only

Non-Public Charging Infrastructure for SMEs

Depots, branch sites and logistics hubs – first-come, first-served, no ranking.

Deadlineclosed on 5 Jun 2026
Incentive rate€500/kW flat rate
Max. incentiveup to €1m
SelectionFirst-come, first-served
Min. output≥ 50 kW DC
Call B · closed
All company sizes

Non-Public Charging Infrastructure for Company E-Truck Fleets

Open to companies of all sizes – competitive ranking by lowest incentive rate per kW.

Deadlineclosed on 7 Jul 2026
Incentive rateup to €500/kW
Max. incentiveup to €5m
SelectionRanking
Min. output≥ 50 kW DC
Call C · closed
Public sites

Public HPC Charging Infrastructure for Electric Trucks

Motorway service areas, charging hubs, HPC sites – weighted ranking with AFIR bonus.

Deadlineclosed on 7 Jul 2026
Incentive rateup to €500/kW
Max. incentiveup to €5m
SelectionWeighted ranking
Min. output≥ 100 kW

Comparison of the Three Calls

Criterion Call A Call B Call C
Target group SMEs only All company sizes All company sizes
Access Non-public Non-public Publicly accessible
Min. output ≥ 50 kW DC ≥ 50 kW DC ≥ 100 kW (rec. 150+ kW / MCS)
Incentive rate €500/kW (flat rate) up to €500/kW up to €500/kW
Max. incentive up to €1m (GBER) up to €5m up to €5m
Selection First-come, first-served Ranking (lowest incentive rate per kW) Weighted ranking (70% incentive rate, 20% AFIR, 10% third-party supply)
Project duration 24 months 24 months 30 months
Application window 5 Jun 2026 (closed on opening day) 26 May – 7 Jul 2026 (closed) 26 May – 7 Jul 2026 (closed)

How the First Round Went

All three calls were heavily oversubscribed: around 1,860 applications requesting just over €1bn in total competed for roughly €300m in available budget.

Source: Project Management Jülich (PtJ), evaluation of applications as of 5 August 2026. Provisional figures – if further projects move up the list, thresholds and project numbers may still change.

Result Call A Call B Call C
Applications received approx. 430 approx. 1,050 approx. 380
Incentives requested approx. €150m approx. €400m approx. €500m
Budget available €150m (increased at short notice from €50m) approx. €67m approx. €83m
Earmarked for approval All applications submitted on opening day, if complete and eligible 206 projects 67 projects, 75% of them at AFIR sites
Successful incentive rate Flat rate, no competition approx. €230/kW or less max. €289/kW with full AFIR and third-party supply points, max. €129/kW without
What matters in the next call:

In a ranking, every euro per kW counts: In Call B, only applicants who requested less than half the maximum were successful. The incentive rate you apply for should therefore be based on a robust business case, not on the maximum available.

In first-come, first-served calls, hours make the difference: Call A was exhausted on its opening day. Site data, quotes and application documents must be complete before a new call opens.

Factor in grid connection costs: Alongside the charger itself, grid connection costs are eligible – including transformer and cabling. As this is typically the largest cost item, early grid connection planning pays off.

Check the no-cumulation rule: Federal incentives from this programme generally cannot be combined with state incentives for the same charging facility. If you are also counting on state programmes, clarify eligibility in advance.

Strategic Questions Before the Next Call

SME or large enterprise: Which call fits your company size?
Public vs. non-public: Which operating model makes more economic sense?
First-come, first-served or ranking: Which selection method better suits your project timeline?
GBER or de minimis: Which state-aid option is best for your situation?
AFIR compliance: Is your planned site on the trans-European core network? (Bonus in Call C)

Maximise Your Incentive for E-Truck Charging Infrastructure with M3E

The incentive programme confronts companies with complex decisions. At the same time, it creates real opportunities to make necessary investments economically viable. M3E supports you from the initial site assessment through to commissioning.

Specialist Expertise in E-Mobility & Incentives

From site assessment through application to commissioning – M3E guides companies and infrastructure operators through every step with proven expertise.

1

Call Matching & Strategy

We identify which incentive call best fits your company structure, site and project timeline – and develop the right strategy.

2

Charging Infrastructure Concept & Site Assessment

We develop an eligible and economically viable charging infrastructure concept – including early grid connection planning, which is often the largest cost item.

3

End-to-End Application

We handle the entire application process – from calculating the incentive rate and preparing all documents to on-time submission.

4

Transparent Fees

Clear fixed prices with no hidden costs. We give you concrete prices in the initial consultation – and explain how the incentive can offset the consulting costs.

Get Ready for the Next Call Now

Book a free consultation directly – together we’ll review your site and project so you’re ready to apply as soon as the next call opens.

Book a consultation now →

Free & non-binding · Instant confirmation by email

FAQ: E-Truck Charging Infrastructure Incentive 2026

The most common questions from our clients – answered directly.

No. All three 2026 incentive calls have closed. Call A for SMEs ended on its opening day, 5 June 2026, after just a few hours because the budget was exhausted – even though it had been increased at short notice from €50m to €150m. Calls B and C closed as scheduled on 7 July 2026.

According to Project Management Jülich, further calls are to be published shortly in view of the high demand; no date has been set yet. The M3E Incentive Alert lets you know as soon as a new call opens.

Well below the €500/kW maximum. In Call B, as of 5 August 2026, 206 projects are earmarked for approval – all of which had requested around €230/kW or less. In Call C, the highest successful incentive rate was €289/kW, and only with full points for AFIR site and third-party supply. Without these bonus points, the figure was €129/kW.

The figures are provisional because the review of applications was still ongoing. For the next call, this means the incentive rate you apply for should be based on a robust business case, not on the maximum available.

That depends on your company size, the planned operating model (public/non-public) and your project timeline. In the first round, Call A was open exclusively to SMEs with non-public charging infrastructure, Call B was open to companies of all sizes for non-public sites, and Call C targeted publicly accessible HPC sites. Whether future calls will follow the same structure is still open. In a free initial consultation, M3E analyses which route suits your situation.

In first-come, first-served calls (Call A), every applicant with a complete, eligible application receives the incentive – as long as budget remains. The time of submission is decisive, not competitive quality. Call A in 2026 showed how quickly this can happen: the budget was exhausted within a few hours.

In ranking procedures (Calls B and C), all applications are prioritised according to defined criteria. In Call B, the lowest incentive rate per kW wins. In Call C, AFIR compliance and the third-party supply model are also factored into the score.

Yes – in all three calls, grid connection costs are eligible alongside the charger itself, including transformer infrastructure and cabling. As this is typically the largest cost item, early grid connection planning pays off. M3E coordinates this as part of application preparation.

As a rule, a no-cumulation rule applies: federal incentives from this programme generally cannot be combined with state incentives for the same charging facility. If you are also counting on state programmes, clarify eligibility in advance. M3E checks this as part of the incentive check.

The Alternative Fuels Infrastructure Regulation (AFIR) requires EU member states to provide charging infrastructure for heavy-duty vehicles along the trans-European core network (TEN-T). Sites meeting these requirements received a 20% bonus in the overall score in Call C.

Our fees are transparent and depend on the scope of services. In the free initial consultation, we give you concrete fixed prices. Consulting costs are usually recouped quickly through the incentive obtained – we’ll show you with a worked example in the initial consultation.

Any Further Questions?

Our team is happy to help:

Subscribe to our newsletter

Jetzt Kontakt aufnehmen